Wednesday 22 August 2007

Foundations









The building inspector passed the foundation formwork and site footings.

So today was concrete day, an early start, 7.00am, the sun rise was brilliant with a heavy frost on the ground, but with a frost you normally get a great day.


We weren't disappointed, the temperature got to about 17 degrees and a clear still day, (midwinter!) global warming?

Tuesday 14 August 2007

The Avenue




Sometimes you need the help of some heavy machinery to get things done.

I did for a fleeting moment think I might be able to do it with some hire machinery but sense prevailed...

Sunday 12 August 2007

The Trenches

The trenches were dug, average of 2 meters depth, the cables and pipe laid and then filled in, never to be seen again, I hope!

Catchup

Have come to a halt in the construction, rain, hurricane force winds of 140km/h, so it's a great opportunity to catch up with the blog.

The trenches have been dug for the drainage, power and telephone, the drive has been constructed, together with the entrance so now there's no excuse for delays due to access.

The drive is looking good with the Almonds, Beech and Poplars that we have planted over the last couple of years, although I think we will remove the Poplars as they have a bad habit of sending out very long roots searching for water, bad mistake.

The concrete pad/foundation will be placed next week, I will need to wait for about two weeks before I can start building the frame.

I will post some pics of the progress later.

Saturday 11 August 2007

Onwards


On with the project...
I dug the foundations out for the concrete pad to be placed. It never ceases to amaze me how the dirt expands when you are digging a hole.

I think it worked out that I moved about 25 cubic meters of earth.

For a secure pad for the foundations to sit on, I had delivered 30 tonnes of metal base course (stones and sand) that's 3 big truck loads, it arrived on Friday my birthday, hurrah!

Had a very entertaining day spreading and leveling the site, I was a little tired, but still had the energy to celebrate. We both went out to a local bistro for dinner for 'the birthday' and the start of stage 1 of the build.

The food was brilliant, happy time, and like all 'responsible' adults, decided to walk home as we both had drunk a 'number' of relaxing wines.

Friday 3 August 2007

The Grand Plan

We have decided to sell the current house as I need more space to be able to continue with the artistry, my painting technique can become a a bit untidy and I tend to fill the available space, so a dedicated area would be great.

The current house is in the corner of the plot (section), we will still have about 4700 square meters to use for the new construction.

The design will be in two stages, the barn which will house our bedroom, studio/office and living area (this will become a small gallery when stage 2 is completed), while the build of the main section of the house is completed.

The barn will give us a place to live while we sell the existing house, giving us the $'s to build stage 2.