Sunday, 13 January 2008

Xmas Family Fun

The team fixing the ceiling in the upstairs bedroom, plywood is very hard to get straight!
The seccret is to shout and stamp your feet!

Lost Pictures



I thought you might like to see these pictures that I just found of the big truss and posts being put in place, it was mind focusing, hanging from a strap putting in bolts about 7 metres from the ground, it doesn't sound high when you write about it but...

Sunday, 6 January 2008

More Computer Probs

The new computer has packed a sad, so took it back and the nice man said sorry, here's another, it works! brilliant. Dick Smith is a great place to buy anything from even if you do not have a receipt to prove purchase.

We have (family) been working over Xmas on the barn and now we have the upstairs ceiling fixed, 100mm grooved plywood panelling, very hard to install, a lot of drama and loud words (me) but with paint and sanding looks great. (thanks team)

Saturday, 29 December 2007

Electronic Disaster

I do not know what wrong with me, all my electronic equipment has taken a dive, camera, computer and CD player.

So you will have to put up with no visuals...

Great news, my wonderful DIY wife has bought me a new laptop. (Totally blown away) now I can see WERT keys, they were worn out (I'm not a touch typist)

Thursday, 13 December 2007

Passed!

The building inspector passed me on my Pre-line Interior ( sounds like a digital Dr examination) this means I can now line the build.

Wednesday, 12 December 2007

Getting There

They say it's not the destination but the journey...

In this case it's definitely the destination.

Tuesday, 11 December 2007

Closed In


At last we are all closed in and the build is now lockable.

putting the windows in was a bit of a mission as the double glazing made them extremely heavy, plus they were a very tight fit. The window manufacturers did say they should have allowed an extra tolerance of 5mm but we got them in. (nice to tell me after they deliverd them)

The bathroom is all ordered including the floor tiles and underfloor heating.

Carpet has been ordered for the bedroom, and they will lay it early February, after the summer break.

It's only stage 1 but I think it's starting to look quite good. (this is looking out of the 'gallery') the seat is so I can sit and imagine...dream??

Tuesday, 4 December 2007

Progress

To bring you up to-date the "Barn" is finally coming together. the windows and doors are all installed, the wiring is complete and the security system is in place.

We should have electricity connected within the next few days.

This means we are able to lockup and I don't have to disconnect and role up the power cable, pack my tools into my trusty 4 wheeler and trundle them to the garage.

This little chore was a little annoying as I haven't been finishing until about 7pm most days.

The weather has been perfect for building over the last 2 weeks clear, sunny and warm.

If the wind stays away I should have the Soffits fixed ( that's the lining that goes under the eaves).

Tuesday, 20 November 2007

Sundown



The end of a great day - achieved a lot, the roof and Velux skylight/window are now fitted, so now the rain doesn't fall on our heads.

We finished the day sitting on our neighbour's deck sipping champagne watching the sun go down, 'what a life'

Saturday, 17 November 2007

Moving On

The roofing contractor left his scaffolding behind, so I have made good use of it, its very high up there, especially when you are wrestling with a 1200 x2400 sheet of plywood.

I now know why Sloths move so slowly when they are climbing trees, they are scared of heights!

This insight came to me while I was moving very slowly over the roof.

The soffits (that's the lining under the eaves) are now being fixed, a difficult job as you have to work above your head height and up the scaffold! (good fun)