Before the move there was a lot of building activity fueled by a little panic, the upstairs bedroom was completed to a standard that all we had to do was move in, so at least we had somewhere to sleep and shower.
Downstairs on the other hand was still in bits as you can see by the photos, no kitchen and no living area.
I had the forethought to get the sky man to install the TV dish so we could watch TV upstairs – a bad move, I sat and watched a rerun of an old Boston Legal episode the other night didn’t finish until midnight!
It’s amazing how much you can get through in 2 weeks.
Ceiling finished, kitchen working (just), floor grouted and sealed. Dry walling completed (well almost).
Now we are in the throws of stopping and plastering, what an awful job dust everywhere.
The good thing Mrs. DIY has banded me from plastering and taken over the task (I don’t do a very good job) Oh aren’t we a multi talented family…
The pics show the progress from almost to all our sitting room and office stacked in the middle of the downstairs’ room.
Downstairs on the other hand was still in bits as you can see by the photos, no kitchen and no living area.
I had the forethought to get the sky man to install the TV dish so we could watch TV upstairs – a bad move, I sat and watched a rerun of an old Boston Legal episode the other night didn’t finish until midnight!
It’s amazing how much you can get through in 2 weeks.
Ceiling finished, kitchen working (just), floor grouted and sealed. Dry walling completed (well almost).
Now we are in the throws of stopping and plastering, what an awful job dust everywhere.
The good thing Mrs. DIY has banded me from plastering and taken over the task (I don’t do a very good job) Oh aren’t we a multi talented family…
The pics show the progress from almost to all our sitting room and office stacked in the middle of the downstairs’ room.