The truss frames were lifted up and 'roughly' placed in position, the wind was increasing, the frames were starting to swing and yours truly was hanging on about 6 meters above the ground.
I was only able to get 3 fixed in place before the predicted high winds arrived (est 120km/hr) this went on and off for the next 2 days.
Sunday arrived and between the All Blacks/French game we finally finished the truss fixing, with Mrs DIY shouting at the TV and Oscar hiding in his retreat under the stairs, a very emotional day!.
No comments:
Post a Comment