Sunday, 7 October 2007

The Stress of it All!

The truss frames were lifted up and 'roughly' placed in position, the wind was increasing, the frames were starting to swing and yours truly was hanging on about 6 meters above the ground.
I was only able to get 3 fixed in place before the predicted high winds arrived (est 120km/hr) this went on and off for the next 2 days.
Sunday arrived and between the All Blacks/French game we finally finished the truss fixing, with Mrs DIY shouting at the TV and Oscar hiding in his retreat under the stairs, a very emotional day!.

No comments:

Post a Comment