Saturday, 3 November 2007

Building Inspection 'Passed"

The posts for the deck/verandah were erected using the HiAb crane from M10, the next day the building inspector passed the build to this point.

The posts are now concreted in and now we can proceed to installing the deck.

We are running a little behind schedule, caused by the extreme winds over the last two weeks, it was to dangerous to work upstairs 120 - 140Km/hr winds, the building creaked and groaned but the temporary bracing worked.

Next it will be wrapping, cladding and the roof (Monday) subject to weather.