Today it is planned for the digger man to start the excavations, first he will have to scape the site of all the topsoil, then I will be able to construct the boxing ready for the concrete foundation to be poured (placed?).

This time I am going to increase the pops required to 600mm centres rather than the 1200mm recommended, this will make sure there's no movement.