Monday, 22 September 2008

Concrete Foundations

Monday dawned a beatiful day, perfect concrete weather, the concrete arrived on time at 7.00am and by 11.00am it was all in place

What a stressful time, I had the terrible feeling that I didn't put enough bracing and the whole thing would collapse and all the cement would run out.

It didn't.

As I blog the men are power floating the surface and adding colour hardener to get the perfect smoooooopth finish.

The frames are due to be delivered later this week so we will be able to get on with the easy bit of the build.

No comments:

Post a Comment