The story of various DIY projects from 'Soup to Nuts' and an 'artist' giving it his best shot at starting a new career
Sunday, 25 January 2009
Monday, 19 January 2009
The Doors (Not Jim Morrison)
Sunday, 18 January 2009
Design Feature
As we have gone as far as we can go until the doors are delivered - promised tomorrow which is a local holiday! so don't expect them until the middle of the week.
To fill in time we have been repairing (restoring) our very old antique doors and sanding back the old railway sleeper that we will be using as a mantelpiece.
Dust and more dust the whole site was coated, little red eyes but the doors are now looking great.
I had to make some major repairs to the jambs replacing damaged and termite eaten timber, we have oiled and waxed the timber to get it back it's natural patina.
To fill in time we have been repairing (restoring) our very old antique doors and sanding back the old railway sleeper that we will be using as a mantelpiece.
Dust and more dust the whole site was coated, little red eyes but the doors are now looking great.
I had to make some major repairs to the jambs replacing damaged and termite eaten timber, we have oiled and waxed the timber to get it back it's natural patina.
Thursday, 15 January 2009
Slow Progress
Although I have been working full time there doesn't seem to be much visible progress, the cladding has gone as far as it can, until the doors are fitted this task cannot be ticked off.
The cladding gets nailed at 150mm centers so it's a bit of a challenge to make sure you dont stick a nail through a power cable or water pipe.
To date I have managed to spear one water pipe and one cable, luckily no power or water was connected so was able to repair quite easily, I getting a bit paranoid about doing it agian and have drawn a layout of the cables and pipes on the outside walls.
The cladding gets nailed at 150mm centers so it's a bit of a challenge to make sure you dont stick a nail through a power cable or water pipe.
To date I have managed to spear one water pipe and one cable, luckily no power or water was connected so was able to repair quite easily, I getting a bit paranoid about doing it agian and have drawn a layout of the cables and pipes on the outside walls.
Monday, 5 January 2009
Progress
The roof is now on, we only have a few tidy-up things to have it complete - what a mission.
I would not have been able to do it without Mrs DIY who overcame her fear of heights.
We were able to get the new kitchen working for Xmas Day, so we were able to cook the turkey, it was a little like camping but it was better than cooking on the BBQ.
Although all the windows are in, we have only one of the big doors installed, this was a exciting event, after the joinery company fitted it, we were standing discussing the locking system and the middle section fell out! gulp!!
Luckily no breakage, only a bent steel bracket (the fixers hadn't tightened it correctly)
Subscribe to:
Posts (Atom)