Although I have been working full time there doesn't seem to be much visible progress, the cladding has gone as far as it can, until the doors are fitted this task cannot be ticked off.
The cladding gets nailed at 150mm centers so it's a bit of a challenge to make sure you dont stick a nail through a power cable or water pipe.
To date I have managed to spear one water pipe and one cable, luckily no power or water was connected so was able to repair quite easily, I getting a bit paranoid about doing it agian and have drawn a layout of the cables and pipes on the outside walls.
No comments:
Post a Comment